A Review on Two-Area Hydro-thermal Power System

Authors

  • shivank shukla Student, Deenbandhu Chhotu Ram University of Science and Technology, Murthal, Haryana

DOI:

https://doi.org/10.37628/ijpecc.v5i2.1209

Abstract

In a two-area system, there will be one automatic load frequency control (ALFC) loop for each control area. Practical aspects considered in this system are reheat turbine in thermal power plant and mechanical governor in hydro-power plant. Reheat turbine improves the efficiency of the system as it again utilizes the steam coming out from high pressure turbine (HP) to run the intermediate pressure (IP) turbine and low pressure (LP) turbine.
Keywords: automatic load frequency control, DISCO, GENCO, flyballs, hydro-thermal power system, immediate pressure, low pressure turbine, reheat turbine

Published

2020-02-19

Issue

Section

Articles